File #: ORD. 15-001    Version: 1 Name: ODOT Contract for US-33 Resurfacing
Type: Ordinance Status: Adopted
File created: 1/5/2015 In control: City Council
On agenda: 1/12/2015 Final action: 2/9/2015
Title: AN ORDINANCE ENACTED BY THE CITY OF GROVEPORT, FRANKLIN COUNTY, OHIO, HEREINAFTER REFERRED TO AS THE LOCAL PUBLIC AGENCY (LPA), IN THE MATTER OF THE STATED DESCRIBED PROJECT
Sponsors: Shawn M. Cleary
Title
AN ORDINANCE ENACTED BY THE CITY OF GROVEPORT, FRANKLIN COUNTY, OHIO, HEREINAFTER REFERRED TO AS THE LOCAL PUBLIC AGENCY (LPA), IN THE MATTER OF THE STATED DESCRIBED PROJECT
Body
WHEREAS, the STATE has identified the need for the following project:

Resurface pavement on US-33 from SR-317 to Fairfield County Line. Includes deck overlay on structures over Blacklick Creek.

NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GROVEPORT, FRANKLIN COUNTY, OHIO, A MAJORITY OF ITS MEMBERS CONCURRING:

Section 1: That it being in the public interest, the LPA gives consent to the Director of Transportation to complete the above described project.

Section 2: The LPA shall cooperate with the Director of Transportation in the above described project as follows:

The LPA hereby agrees to cooperate with the Director of Transportation of the State of Ohio in the planning, design and construction of the identified highway improvement project and grants consent to the Ohio Department of Transportation for its development and construction of the project in accordance with plans, specifications and estimates as approved by the Director;

ODOT agrees to assume and bear one hundred percent (100%) of the costs of preliminary engineering, right-of-way, and construction.

The LPA agrees to assume and bear one hundred percent (100%) of the total cost of those features requested by the LPA which are not necessary for the improvement as determined by the State and Federal Highway Administration.

Section 3: The LPA agrees that all right-of-way required for the described project will be acquired and/or made available in accordance with current State and Federal regulations. Right-of-way costs include eligible utility costs. The LPA agrees to be responsible for all utility accommodation, relocation and reimbursement and agrees that all such accommodations, relocations and reimbursements shall comply with the current provisions of 23 CFR 645 and the ODOT Utilities Manual.

...

Click here for full text