File #: ORD. 19-020    Version: Name: 2400 Rohr Rd-Final Dev Plan
Type: Ordinance Status: Adopted
File created: 4/10/2019 In control: City Council
On agenda: 4/22/2019 Final action: 8/26/2019
Title: AN ORDINANCE APPROVING THE FINAL DEVELOPMENT PLAN FOR 2400 ROHR ROAD, DERIK LEARY, APPLICANT, (PARCEL NUMBER 154-000002)
Sponsors: Chad T. Grashel
Attachments: 1. ORD. 19-020 Exhibit A.pdf, 2. ORD. 19-020 Exhibit B.pdf
Title
AN ORDINANCE APPROVING THE FINAL DEVELOPMENT PLAN FOR 2400 ROHR ROAD, DERIK LEARY, APPLICANT, (PARCEL NUMBER 154-000002)
Body
WHEREAS, it is necessary that the final development plan for 2400 Rohr Road, Derik Leary, Applicant (Parcel Number 154-000002) be accepted.

NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GROVEPORT, FRANKLIN COUNTY, OHIO, A MAJORITY OF ITS MEMBERS CONCURRING:

Section 1: That the final development plan for 2400 Rohr Road, (Parcel Number 154-000002) a copy of which is attached hereto and made a part hereof by reference, is hereby approved provided that all of the following conditions set forth by the Planning & Zoning Commission are satisfied:
1. That prior to development of Lot 3 a modification to the development plan showing building elevations, building size and location, sign locations, exhibits, and other information required to verify compliance with zoning regulations, shall be submitted for approval by Planning Commission and Council.
2. Additional screening / buffering to be installed around the residential properties on Aloha Drive.
3. A Development Agreement be established and entered into between the City and Developer before site development begins, to memorialize requirements of the Developer for the water main extension, sanitary sewer main extension and off-site roadway system improvements.
4. Site development design shall conform to the City of Groveport stormwater management policies and regulations, including requirement for directing site managed storm drainage into an adequate drainage outlet that has positive flow.
5. The new public sanitary sewer main needed to serve the development shall be extended into and through the site contemporaneously with the site development of the three lots in the project. The design of said sewer (i.e., size, depth, pipe and manhole material, specifications and alignment) shall be per the requirements of the City of Groveport and City of Columbus (per service agr...

Click here for full text