File #: ORD. 19-022    Version: Name: 5770 Saltzgaber Rd Re-Zoning
Type: Ordinance Status: Adopted
File created: 5/16/2019 In control: City Council
On agenda: 5/28/2019 Final action: 9/23/2019
Title: AN ORDINANCE AMENDING THE ZONING MAP AS TO APPROXIMATELY 37.68 ACRES, MORE OR LESS, OF THE FOLLOWING TRACT OF LAND, LOCATED AT 5770 SALTZGABER ROAD, PARCEL NUMBER 185-002541 OWNED BY, DMH FARMS LLC FROM RURAL (UNZONED) TO PLANNED INDUSTRIAL PARK (PIP)
Sponsors: Scott Lockett
Attachments: 1. ORD. 19-022 Exhibit A.pdf, 2. ORD. 19-022 Exhibit B.pdf

Title

AN ORDINANCE AMENDING THE ZONING MAP AS TO APPROXIMATELY 37.68 ACRES, MORE OR LESS, OF THE FOLLOWING TRACT OF LAND, LOCATED AT 5770 SALTZGABER ROAD, PARCEL NUMBER 185-002541 OWNED BY, DMH FARMS LLC FROM RURAL (UNZONED) TO PLANNED INDUSTRIAL PARK (PIP)

Body

WHEREAS, it would be in the best interest of the citizens of the City of Groveport Ohio, if certain properties were re-zoned.

 

NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GROVEPORT, FRANKLIN COUNTY, OHIO, A MAJORITY OF ITS MEMBERS CONCURRING:

 

Section 1: That the tract of land being approximately 37.68 acres, more or less, located at 5770 Saltzgaber Road, Parcel Number 185-002541 be re-zoned from Rural (Unzoned) to Planned Industrial Park (PIP) pursuant to the attached re-zoning application of petitioner, Paul Hemmer Companies and legal description.

 

Section 2: That the zoning map shall be amended to reflect Section 1 provided that petitioner conforms with the requirements, conditions and/or recommendations of the Planning & Zoning Commission and/or Council and, further, provided that all of the following conditions set forth by the Planning & Zoning Commission are satisfied:

1.Additional screening of the project from the residential properties to the west and south along Saltzgaber Road shall be required.

2. That prior to development of Lot 1 a modification to the development plan showing building elevations, building size and location, sign locations, exhibits, and other information required to verify compliance with zoning regulations shall be submitted for approval by Planning Commission and Council.

3. A Development Agreement be established and entered into between the City and Developer before site development begins, to memorialize requirements of the Developer for the public water main and public sanitary sewer main extension improvements and the off-site roadway system improvements, including the Saltzgaber Road improvement and the intersection improvements at Groveport Road and Saltzgaber Road.

4. Offsite Roadway improvements on Saltzgaber Road and Groveport Road shall be designed per requirements of Franklin County Engineer (as an agent for Madison Township) and City of Groveport as appropriate by jurisdictional control.  Street lighting shall be incorporated into Groveport Street improvement.

5. Site development design shall conform with the City of Groveport requirements, including but not limited to compliance with stormwater management policies and regulations, including requirement for directing site managed storm drainage into an adequate drainage outlet that has positive flow.

6. No access into the site from Groveport Road shall be allowed.

7. Geometric configuration of site access driveways to / from Saltzgaber Road shall be designed and constructed per requirements of Franklin County Engineer (as an agent for Madison Township) and City of Groveport as appropriate by jurisdictional control.

8. Sanitary sewers and Water Mains (i.e., Public Utilities) shall be extended along the project site frontage, contemporaneously with or prior to the construction of site improvements.  The design and construction of Public Utilities (i.e., size, depth, pipe and manhole material, specifications and alignment) shall be per the requirements of the City of Groveport and City of Columbus (per service agreement with Columbus). Easements for these Utilities shall be established with site development via Plat or separate instrument.

9. Any future proposed guard-house and / or gates on site shall be subject to prior approval of the City of Groveport’s Chief Building Official and City Engineer.

 

Section 3: That for the reasons stated in the preamble hereto which are made a part hereof, this Ordinance shall take effect and be in full force from and after the earliest period allowed by law.

 

_____________________________

Lance Westcamp, Mayor

 

 

_____________________________

Ruthanne Sargus Ross, CMC

Clerk of Council

 

Approved as to form:

 

 

_____________________________

Kevin C. Shannon, Law Director